Design, Supply, Erection, Testing & commissioning of 25 kV, 50 Hz, Single Phase, AC,Electrification including OHE & TSS Works” in Amritsar (Excl.) – Batala – Bharoli (Excl.) section Group – 253 in Firozpur Division of Northern Railway under RE Project Ambala, Total 104 RKM/ 124 TKM. and Punjab
Project Value : INR 34.73 Crs
Project VaDesign, Supply, Erection, Testing & Commissioning of 25 kV, 50 Hz, Single Phase, AC, Electrification Works including OHE & TSS as Composite Electrical Works” in Gorakhpur (Exc.) – Kaptanganj – Valmikinagar (Exc.) section, Group-218 in Varanasi Division of Northeastern Railway under RE Project Lucknow, Total 96 RKM/ 113 TKM. and Uttar Pradesh
Project Value: 36.92 Crs
“Design, Supply, Erection, Testing & Commissioning of 25 kV, 50 Hz, Single Phase, AC, Electrification including OHE & TSS Works" in Ara (Excl.) - Sasaram (Excl.) section, Group-230 in Mugalsarai Division of East Central Railway under RE Project Danapur, Total - RKM 97 / 122 TKMs- and Bihar
Project Value: INR 33.01 crs
Design, Supply, erection, testing & commissioning of 25 KV OHE for the work of: (i) Doubling between Madhopur Punjab and Kathua (J&K) including Bridge No. 16, 17 (Ravi Bridge), 18 & 19 (ii) Bari Brahman - Development of satellite of freight goods terminal (iii) Goods Handling line with covered goods shed and cement handling facilities at Chhan Arorian
Project Value : 6.17 Crs
Design, Supply, erection, testing and commissioning of 25 Kv AC single Phase OHE including modification of SSP/SP & existing SCADA in connection with electrification of doubling between Amethi pratapgarh section of Lucknow division
Project Value : 17.01 Crs
Design, Supply, erection, testing & commissioning of 25 kV AC single phase OHE for the Electrification work of:Deoband (Includ.) to Tapri (Includ.) & 2nd phase work of MOZ yard related to new UP Loop line
Project Value: INR 14.80 crs
Design, Supply, Erection, Testing & Commissioning of 25 kV AC single phase OHE for the work of Electrification of New Loop Line at Balamau, Dilawarnagar, Umartali, Masit, Todarpur, Miranpur Katra, Mewa Nawada, Chakrajmal, Chandok, and Chodiala stations on Lucknow-Moradabad-Saharanpur Section of Moradabad Division.
Project Value : INR 10.66 Crs
Design, Supply, erection, testing & commissioning of 25 KV OHE for the work of "Longer Loop Lines at Chiheru, Kartarpur, Jandiala & Manawala Station over Firozpur Division
Project Value : 11.92 Crs
Design, Supply, Erection, Testing and commissioning of feeder wire for 2x25 KV system for raising of speed to 160/200 KMPH on existing Lucknow-Kanpur section in connection with mission raftaar of Lucknow Division (Phase-1).
Project Value: INR 17.24 Crs
Design, Supply, Erection, Testing and commissioning of feeder wire for 2x25 KV system for raising of speed to 160/200 KMPH on existing Lucknow-Kanpur section in connection with mission raftaar of Lucknow Division (Phase-1).\
Project Value : INR 23.53 Crs
Design, supply, Erection, Testing & commissioning of 25 KV, 50 Hz, single phase, AC, OHE including new SP at Jhabrera,new SSP at RK, extension/Modification of existing SSP at DBD for the electrification work of :-Deoband-Roorkee new line along with Roorkee Yard remodeling work in connection with RK DBD line in DLI Division"section of Lucknow division
Project Value : INR 13.12 Crs
Modification required in existing OHE arrangement & replacement of overaged OHE in connection with raising the speed to 160 kmph on existing NDLS-CPYZ section & DLI Area of Delhi Division.
Project Value : INR 18.13 Crs
Design, Supply, Erection, Testing & Commissioning of 25kV, 50 Hz, Single Phase, AC Electrification including OHE &TSS of 2nd line of Bagalkot-Wandal section along with leftover works required for commissioning of Bagalkot-Wandal section
Project Value : INR 27.64 Crs
Design, Supply, Erection, Testing &Commissioning of 25 KV AC single phase OHE in c/w construction of (i) New line between Daulatpur Chowk to Talwarastation on Nangaldam- Talwara Section, (ii) New Bypass line at CNDM station on Chandigarh-Baddi Section including "GPS Electrification work in both sections" over Ambala division.
Project Value: 12.83 Crs
Provision of earthing station (Buried Rail) at switching posts, 160 Sq mm Jumper in place of 105 Sq mm jumper and new cantilevers in place of decayed cantilever for strengthening of OHE over Ambala Division
Project Value: INR 6,17 Crs